Product ID · XCMG-MACHINE-XLC130-424411A3
Crawler Crane XLC130
Max. rated lifting capacity: t | 130 Boom single pulley working condition: 13.5 Fixed jib working condition: 45 Tower jib working condition (optional): 45 Max. lifting moment: 742.2 Size dimension: m | 20~74 Fixed jib length (optional): 13~31 Main boom length under fixed jib working condition: 20~53 The max. combination of main boom + fixed jib: 47+31/50+28 Tower jib length (optional): 22~49 Main boom length under tower jib working condition: 20~50 The max. combination of main boom + tower jib: 47+49 Speed parameters: m/min | 120 Max. single line speed of boom luffing: 60 Max. single line speed of tower jib luffing: 75 Max. slewing speed: 1.1 Max. travel speed: 1.5 Engine: kW | 241 : - | National III off-road Overall crane weight (20m basic boom, 100t hook, 38t turntable counterweight, 12t car-body counterweight): 121 Average ground pressure: 0.094 Gradeability: 30% Max. transport weight
- Product ID
- XCMG-MACHINE-XLC130-424411A3
- Equipment Type
- Hoisting Machinery
- Machine System
- Hoisting Machinery
- Compatible Brands
- XCMG
- Main Equipment Series
- XLC130
- Reference Numbers
- XCMG-MACHINE-XLC130-424411A3
- Condition
- XCMG catalogue item
- Availability
- RFQ
FITMENT
Compatibility & Identification
- Reference Numbers
- XCMG-MACHINE-XLC130-424411A3
TECHNICAL DATA
Technical Specifications
| Product code | XCMG-MACHINE-XLC130-424411A3 | Product name | Crawler Crane XLC130 |
|---|---|---|---|
| Category | Hoisting Machinery | ||
| Item | Unit | Parameter |
|---|---|---|
| Max. rated lifting capacity | Main boom working condition | t | 130 |
| Boom single pulley working condition | t | 13.5 |
| Fixed jib working condition | t | 45 |
| Tower jib working condition (optional) | t | 45 |
| Max. lifting moment | t.m | 742.2 |
| Size dimension | Boom length | m | 20~74 |
| Fixed jib length (optional) | m | 13~31 |
| Main boom length under fixed jib working condition | m | 20~53 |
| The max. combination of main boom + fixed jib | m | 47+31/50+28 |
| Tower jib length (optional) | m | 22~49 |
| Main boom length under tower jib working condition | m | 20~50 |
| The max. combination of main boom + tower jib | m | 47+49 |
| Speed parameters | Max. single line speed of hoisting | m/min | 120 |
| Max. single line speed of boom luffing | m/min | 60 |
| Max. single line speed of tower jib luffing | m/min | 75 |
| Max. slewing speed | rpm | 1.1 |
| Max. travel speed | km/h | 1.5 |
| Engine | Rated power | kW | 241 |
| Overall crane weight (20m basic boom, 100t hook, 38t turntable counterweight, 12t car-body counterweight) | t | 121 |
| Average ground pressure | MPa | 0.094 |
| Gradeability | - | 30% |
| Max. transport weight of single unit | t | 33.7 |
| Max. transport size of single unit (L x W x H) | m | 11.0 x 3.0 x 3.2 |
RFQ CHECKLIST
Before requesting a quotation
- Machine brand and model
- Visible original part number or nameplate
- Front, rear and connector photographs
- Required quantity and destination country
Confirm whether this part fits
Send the machine model, nameplate or photos of the old part and we will help verify it.





